A well testing way to shorten closed time effectively
Keywords:
Convolution pressure build up, Liquid build upAbstract
Influenced by effect of bore hole afterflow,a long closes time is needed for pressure build up test in low permeability reservoir. Using testing technology of annulus fluid level to build up and pressure at well bottom to build up synchronously and its correspond interpreting method can shorten the tested time over 30 percentages.
References
Monta N., Boyd P.A., Typical Sand Production Problems Case Studies and Strategies for Sand Control [C], SPE22739, (1991); Montal N., Whitfill D.L., Fedde O.P.,
Et al., Parametric Study of Sand Production Prediction-Analytical Approach [C].
SPE Annual Technical Conference and Exhibition Dallas, September27-30, SPE16990, (1987)
Published
How to Cite
Issue
Section
License
Copyright (c) 2005 Well Testing
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
This license requires that re-users give credit to the creator. It allows re-users to distribute, remix, adapt, and build upon the material in any medium or format, for noncommercial purposes only.