A well testing way to shorten closed time effectively

Authors

  • Pei L

Keywords:

Convolution pressure build up, Liquid build up

Abstract

Influenced by effect of bore hole afterflow,a long closes time is needed for pressure build up test in low permeability reservoir. Using testing technology of annulus fluid level to build up and pressure at well bottom to build up synchronously and its correspond interpreting method can shorten the tested time over 30 percentages.

References

Monta N., Boyd P.A., Typical Sand Production Problems Case Studies and Strategies for Sand Control [C], SPE22739, (1991); Montal N., Whitfill D.L., Fedde O.P.,

Et al., Parametric Study of Sand Production Prediction-Analytical Approach [C].

SPE Annual Technical Conference and Exhibition Dallas, September27-30, SPE16990, (1987)

Published

30-09-2020

How to Cite

Pei, L. (2020). A well testing way to shorten closed time effectively. Well Testing Journal, 29(2), 13–16. Retrieved from https://welltestingjournal.com/index.php/WT/article/view/20

Issue

Section

Research Articles

Similar Articles

1 2 3 > >> 

You may also start an advanced similarity search for this article.