Fixed sealing tech by paraffin for well head of wire-line read out testing and oil recovery
Keywords:
Fixed, ParaffinAbstract
During developing period of the oilfield, some wells need a long term to test, especially for wells of acquiring data of oil testing and recovery. When monitoring formation pressure by read-out electronic gauge, it is a technical problem to settle that the sealing condition of signal line at well head is not good. Firstly, fixed sealing tech by paraffin for well head of wire line is using compressed sealing colloid out of wire-line for testing voltage to seal primarily at the two ends. And then, melt liquid wax is inject in inner body and high pressure is made to make the liquid wax penetrating clearance between outer steel line of wire line and outer insulated skin of the core line that seals the wire-line at well head for acquiring pressure properly when high pressure liquid wax is solidified. The method and process of it is illustrated which has a valuable effect.
References
Athichanagorn S., Development of an Interpretation Methodology for Long-Term Pressure Data From Permanent Downhole Gauges, (1999)
Published
How to Cite
Issue
Section
License
Copyright (c) 2007 Well Testing
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
This license requires that re-users give credit to the creator. It allows re-users to distribute, remix, adapt, and build upon the material in any medium or format, for noncommercial purposes only.