Application of non shut-in pressure build-up test technique in gas well

Authors

  • Qi,Q Monitoring and Studying Center, Zhongyuan Oil Field Sub-Company; Natural Gas Manufacture and Sell Factory

Keywords:

Analysis of well testing, Gas well testing

Abstract

By changing the gas production rate once time (from big production rate to little), measurement is made on build-up pressure changes continuously. Analyses of detection and well testing to 15 wells indicate that by using the technique the result being equivalent with shut-in pressure is obtained, testing time is short, loss of gas producing potential is reduced and production efficiency is raised. All of that provides strategic data for production of gas oilfield.

References

Denning P.J., Genetic algorithm, American Societist, 80, pp. 12-14, (1992)

Published

30-03-2020

How to Cite

Qi, Q. (2020). Application of non shut-in pressure build-up test technique in gas well. Well Testing Journal, 29(1), 6–12. Retrieved from https://welltestingjournal.com/index.php/WT/article/view/13

Issue

Section

Research Articles

Similar Articles

<< < 1 2 3 4 5 6 7 > >> 

You may also start an advanced similarity search for this article.