Optimize of gas test system in eastward pu sunken deep gas reservoir
Keywords:
Deep formation gas reservoir, Production potentialAbstract
For deep gas reservoir, it usually exists the problem about the long period of gas test, output and press not being stable, excessive accumulate fluid in the bottom of a well to cause the gas well being ceased to spout. Through the research in critical fluid and gas quantity in deep multiphase gas well and gas test curve, a reasonable working system of gas test in deep formation gas reservoir is confirmed which offers a basis for gas test in deep formation gas pool for the future.
References
Monta N., Boyd P.A.,
Typical Sand Production Problems Case Studies and Strategies for Sand Control [C]
SPE22739, (1991); Montal N., Whitfill D.L., Fedde O.P., Et al.,
Parametric Study of Sand Production Prediction-Analytical Approach [C]
SPE Annual Technical Conference and Exhibition Dallas, September27-30, SPE16990, (1987)
Published
How to Cite
Issue
Section
License
Copyright (c) 2006 Well Testing
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
This license requires that re-users give credit to the creator. It allows re-users to distribute, remix, adapt, and build upon the material in any medium or format, for noncommercial purposes only.