Improved imagine for down hole low-concentrating flowmeter

Authors

  • We

Keywords:

Development, Experiment

Abstract

For completing the test of wells with high, medium and low production, avoiding from flow-concentrating pressure difference and up push appeared at collector of bore hole fluid to produce a confine for the upper measuring limitation of down hole flow-concentrating flowmeter. The paper suggests a plan that using one down hole flow-concentrating flowmeter down and up once time in the oil well to finish test for different produced layers and integrate full and part down hole flow-concentrating flowmeter to make every flow-meter have feature of full and part flow-concentrating. The new flowmeter has the characteristics of low floor level, extensive testing scope, automatic distributary and stable testing point.

References

Monta N., Boyd P.A.,

Typical Sand Production Problems Case Studies and Strategies for Sand Control [C], SPE22739, (1991); Montal N., Whitfill D.L.,

Fedde O.P., Et al., Parametric Study of Sand Production Prediction-Analytical Approach [C]. SPE Annual Technical Conference and Exhibition Dallas, September27-30, SPE16990, (1987)

Published

30-09-2021

How to Cite

We, W. (2021). Improved imagine for down hole low-concentrating flowmeter. Well Testing Journal, 30(2), 23–26. Retrieved from https://welltestingjournal.com/index.php/WT/article/view/33

Issue

Section

Research Articles