Horizontal well production technology without well-pulling job in Shengli oilfield

Authors

  • Xuemei, C Oil Recovering Technol. Res. Inst., Shengli Oilfield, China

Keywords:

Application; Horizontal well; Oil recovery; Pipe string; Test; Water detecting

Abstract

A new horizontal well production technology without dismantling well head and pulling up string to find water and test is introduced which can decrease operating times and cost. The pipe string includes double hydraulic cylinder with anchorage packer double hydraulic cylinder without anchorage packer releasing too reversing valve and centralizer. The results of tests show that the technology pipe string is advanced and reliable and has an obvious social and economical benefit.

References

Thompson L.G.,

Efficient Algorithms for Computing the Bounded Reservoir Horizontal Well Pressure Response;

Ozken Z., Raghavan R., New Solution for Well Test Analysis Problems: Part I - Analytical Considerration, pp. 359-368, (1991);

Ozken Z., Raghavan R., New Solution for Well Test Analysis Problems: Part II-computation Considerration, pp. 369-377, (1991);

Ozken Z., Raghavan R., New Solution for Well Test Analysis Problems: Part III-additional Algorithms; Bramowitz M., Stegun I.A., Handbook of Mathematical Functions, (1972);

Gringarten A., Ramey H., The Use of the Source and Green's Function in Solving Unsteady-flow Problems in Reservoirs, pp. 285-296, (1973)

Published

30-09-2019

How to Cite

Xuemei, C. (2019). Horizontal well production technology without well-pulling job in Shengli oilfield. Well Testing Journal, 28(1), 1–5. Retrieved from https://welltestingjournal.com/index.php/WT/article/view/1

Issue

Section

Research Articles

Similar Articles

<< < 1 2 3 4 5 6 7 > >> 

You may also start an advanced similarity search for this article.